Bath County Pumped Storage Station
Bath County Pumped Storage Station is located in Virginia
Bath County Pumped Storage Station
Location of Bath County Pumped Storage Station in Virginia
CountryUnited States
LocationBath County, Virginia
Coordinates38°13′50″N 79°49′10″W / 38.23056°N 79.81944°W / 38.23056; -79.81944
PurposePower
StatusOperational
Construction beganMarch 1977; 47 years ago (1977-03)
Opening dateDecember 1985; 39 years ago (1985-12)
Construction costUS$1.6 billion
($4.53 billion in 2023 dollars)
Owner(s)Dominion Generation (60%)
LS Power (24%)
FirstEnergy (16%)[1]
Upper dam and spillways
Type of damEmbankment dam
Height (foundation)460 ft (140 m)
Length2,200 ft (670 m)
Dam volume18,000,000 cu yd (14,000,000 m3)
Upper reservoir
Total capacity35,599 acre⋅ft (43,911,000 m3)
Surface area265 acres (107 ha)
Lower dam and spillways
Type of damEmbankment dam
Height (foundation)135 ft (41 m)
Length2,400 ft (730 m)
Dam volume4,000,000 cu yd (3,100,000 m3)
Spillways1
Lower reservoir
Total capacity27,927 acre⋅ft (34,447,000 m3)
Surface area555 acres (225 ha)
Power Station
Coordinates38°12′32″N 79°48′00″W / 38.20889°N 79.80000°W / 38.20889; -79.80000
Commission dateDecember 1985; 39 years ago (1985-12)
TypePumped-storage
Hydraulic head1,262 feet (385 m)[2]
Pump-generators6 × 480/500.5 MW Francis pump-turbines
Installed capacity3003 MW
Overall efficiency79%
Storage capacity11 hours (24,000 MWh)
2017 generation-935 GW·h
Website
Bath County Pumped Storage Station Website

The Bath County Pumped Storage Station is a pumped storage hydroelectric power plant with a maximum generation capacity of 3,003 MW,[3] an average of 2,772 MW,[4] and a total storage capacity of 24,000 MWh.[4] The station is located in the northern corner of Bath County, Virginia, on the southeast side of the Eastern Continental Divide, which forms this section of the border between Virginia and West Virginia. The station consists of two reservoirs separated by about 1,260 feet (380 m) in elevation. It was the largest pumped-storage power station in the world until 2021, when it was surpassed by the Fengning Pumped Storage Power Station.[5]

Construction on the power station, with an original capacity of 2,100 megawatts (2,800,000 hp), began in March 1977 and was completed in December 1985 at a cost of $1.6 billion,[6][7] Voith-Siemens upgraded the six turbines between 2004 and 2009, increasing power generation to 500.5 MW and pumping power to 480 megawatts (640,000 hp) for each turbine.[8][9] Bath County Station is jointly owned by Dominion Generation (60%) and FirstEnergy (40%), and managed by Dominion.[5] It stores energy for PJM Interconnection, a regional transmission organization in 13 states and the District of Columbia.[4]

Design

[edit]

The upper and lower reservoirs are created by earth and rock-filled embankment dams. The upper reservoir dam is 460 feet (140 m) high, 2,200 feet (670 m) long and has a structural volume of 18,000,000 cubic yards (14,000,000 m3). The upper reservoir on Little Back Creek has a surface area of 265 acres (107 ha) and storage capacity of 35,599 acre-feet (43,911,000 m3). The lower reservoir dam on Back Creek is 135 feet (41 m) high and 2,400 feet (730 m) in length. It has a structural volume of 4,000,000 cubic yards (3,100,000 m3) and creates a reservoir with a surface area of 555 acres (225 ha) and storage capacity of 27,927 acre-feet (34,447,000 m3).[8][5] Connecting the upper reservoir to the power station are three water conduits between 3,100–3,600 feet (940–1,100 m) long. The conduits each lead to a 990 feet (300 m) shaft which bifurcates into two penstocks (for a total of six) before reaching the turbines. Each penstock is 18 feet (5.5 m) in diameter and between 900–1,260 feet (270–380 m) in length. Maximum static pressure from the top of the water delivery system to the turbines is 1,320 feet (400 m).[8][10]

Method of operation

[edit]

Water is released from the upper reservoir during periods of high demand and is used to generate electricity. What makes this different from other hydroelectric dams is that during times of low demand, power is taken from coal, nuclear, and other power plants and is used to pump water from the lower to the upper reservoir. Although this plant uses more power than it generates, it allows these other plants to operate at close to peak efficiency for an overall cost savings. Back Creek and Little Back Creek, the water sources used to create the reservoirs, have a relatively small flow rate. However, since water is pumped between the reservoirs equally, the only water taken from these creeks now that the reservoirs are full is to replace the water lost to evaporation. During operation, the water level fluctuates by over 105 feet (30 m) in the upper reservoir and 60 feet (20 m) feet in the lower reservoir.

When generating power, the water flow can be as much as 13.5 million US gallons (51,000 m3) per minute (850 m3/s). When storing power, the flow can be as much as 12.7 million US gallons (48,000 m3) per minute (800 m3/s).

Environment

[edit]

A fishing habitat was created downstream of the facility.[12] In times of drought[13] water quality can be maintained[14] by using nearby recreational reservoirs to supply extra water to the creeks.[15] The creeks and recreational reservoirs have water quality sufficient for fish.[16][17]

See also

[edit]

References

[edit]
  1. ^ Simonis, Emily (May 4, 2018). "LS Power Completes Acquisition of 1,600 MW Power Northeast Generation Portfolio". Retrieved May 21, 2024.
  2. ^ "Pumped Storage in Bath County". www.virginiaplaces.org. Retrieved November 28, 2017.
  3. ^ "Bath County Pumped Storage Station | Dominion Energy". www.dominionenergy.com. Archived from the original on March 29, 2019. Retrieved March 29, 2019.
  4. ^ a b c Koronowski, Ryan (August 27, 2013). "The Inside Story Of The World's Biggest 'Battery' And The Future Of Renewable Energy". ThinkProgress. Retrieved September 11, 2019.
  5. ^ a b c "Bath County Pumped Storage Station". Dominion Energy. Archived from the original on January 3, 2012. Retrieved July 9, 2010.
  6. ^ "Bath County Pumped Storage" Archived October 2, 2011, at the Wayback Machine, Civil Engineering—ASCE, Vol. 55, No. 7, July 1985, pg. 55
  7. ^ Updating SCADA Systems Archived November 20, 2008, at the Wayback Machine ModComp. Retrieved: 29 August 2010.
  8. ^ a b c Refurbishment Power Gen, 21 January 2004. Retrieved: 29 August 2010.
  9. ^ "Bath County, USA". Voith-Siemens. Retrieved April 12, 2013.
  10. ^ Wong, K.L.; R.G.Oechsel; D.T.Wafle (September 16, 1988). "Bath County Pumped Storage Project Tunnel System - Evaluation of Remedial Measures". Madrid, Spain: International Society for Rock Mechanics. IS-1988-051. {{cite journal}}: Cite journal requires |journal= (help)[permanent dead link]
  11. ^ Bath County Pumped Storage Hydroelctric Station (Informational sign outside the gate at the lower reservoir). Bath County, Virginia: Virginia Power.
  12. ^ Singletary, William C., Jr.Stream Habitat Improvements Archived June 5, 2010, at the Wayback Machine Water Resources Research Forum page 9, 1988. Retrieved: 29 August 2010.
  13. ^ Bollinger, Mike (August 21, 2008). "Water customers asked to conserve in drought". The Recorder Online. Archived from the original on October 6, 2019. Retrieved August 29, 2010.
  14. ^ Watershed quality United States Environmental Protection Agency, 2008. Retrieved: 29 August 2010.
  15. ^ FR Doc 02-9027 Archived October 2, 2011, at the Wayback Machine Federal Register, 9 April 2002. Retrieved: 29 August 2010.
  16. ^ Colbert, Judy. Virginia Off the Beaten Path, 10th 2008, page 174. ISBN 0-7627-4881-8, ISBN 978-0-7627-4881-5
  17. ^ Mark Fike. Bugas. Bream Fishing Archived December 6, 2010, at the Wayback Machine Virginia Game & Fish. Retrieved: 29 August 2010.
[edit]